Modeling for Process Design Using HTP Sim


Modeling can be a powerful tool for designing various aspects of the heat treatment process. One application is to design the heating time required for complex geometries to reach the furnace temperature.

Cylinder Geometry

OD: 100 mm

Furnace Temperature: 950 °C.

By analyzing the core temperature history from the model, we can determine the optimal time required to reach the target temperature.

If we set a target temperature of 940 °C for the core, the required time it takes to reach the target temperature for this geometry is about 1.79 hours (107 minutes). After adding an additional 30 minutes for austenitizing, the total heating time comes out to approximately 2.29 hours (137 minutes). Modeling the core temperature of any geometry can greatly optimize the heating process by saving valuable time.


Student/Trial License

Learn heat treatment. Explore simulation.

Start with the DANTE Student’s Guide to Heat Treating, a quick reference covering the fundamentals of heat treatment, steel microstructures, and common processes. Ready to go further? Get hands-on experience with DANTE through our student/trial license and explore real-world heat treatment simulations.

resources

Research Ft DANTE

Explore published articles from professionals who’ve used DANTE in their scientific research.

Talk with our experts

Have a project or a question about heat treating? Connect with our engineers for to discuss how DANTE can fit into your workflow.

DANTE latent heat during austenitizing

tools for heat treatment modeling

See how the DANTE suite enables engineers to simulate quenching, distortion, hardness, stress, and metallurgical phases

Proven industry results

Explore our case studies showing how DANTE FEA predicts distortion, hardness, phase changes, and residual stress.